August 11, 2017; 1st and 2nd Floor Construction, Hesburgh Library, Staircase opening. (Photo by Steve Toepp/University of Notre Dame)

ST 8.11.17 Library Construction 051.jpg

Purchase Print

1 of 1

August 11, 2017; 1st and 2nd Floor Construction, Hesburgh Library, Staircase opening. (Photo by Steve Toepp/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I00002UXBKMyGGnI

Keywords:

Hesburgh
Library
renovation