September 2, 2016; Hesburgh Library renovation on the 4th floor. (Photo by Barbara Johnston/University of Notre Dame)

BJ 9.2.16 Hesburgh Library Renovation 9905.JPG

1 of 1

September 2, 2016; Hesburgh Library renovation on the 4th floor. (Photo by Barbara Johnston/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I00003728tX1YKn4

Keywords:

Hesburgh
Library
renovation
construction
4th
floor