Jan. 28, 2015; Dirt excavated from Campus Crossroads project is dumped in a temporary storage pile.  (Photo by Matt Cashore/University of Notre Dame)

1.28.15 Campus Crossroads Construction 1.JPG

Purchase Print

1 of 1

Jan. 28, 2015; Dirt excavated from Campus Crossroads project is dumped in a temporary storage pile. (Photo by Matt Cashore/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I0000BPilUM7UoJI

Keywords:

campus
crossroads
ccp
construction
2015