Sept. 15, 2015; "ND #1" is written on a steel beam of the Duncan Student Center as it is under construction. (Photo by Matt Cashore/University of Notre Dame)

9.15.15 CCP ND1-2.JPG

1 of 1

Sept. 15, 2015; "ND #1" is written on a steel beam of the Duncan Student Center as it is under construction. (Photo by Matt Cashore/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I0000CZLZYrv7.7c

Keywords:

ccp
campus
crossroads
project
capital
construction
steel
girder
girders
nd
#
1
duncan
student
center
west
building