BJ 3.6.24 Geothermal 1434.JPG
- 1 of 1


March 5, 2024; The construction site of the geothermal system installation adjacent to the Joyce Center and Jordan Hall of Science on Dorr Road. (Photo by Barbara Johnston/University of Notre Dame)
Copyright University of Notre Dame
Copy link below when linking to original image:
https://photos.nd.edu/image/I0000IxCu8jc2y54