ST 8.11.17 Library Construction 040.jpg
- 1 of 1


August 11, 2017; 1st and 2nd Floor Construction, Hesburgh Library, Staircase opening. (Photo by Steve Toepp/University of Notre Dame)
Copyright University of Notre Dame
Copy link below when linking to original image:
https://photos.nd.edu/image/I0000KpIoTdIV6Z0