MC 12.20.21 Hydroelectric Project Turbines 05.JPG
- 1 of 1


December 20, 2021; Turbines installed at the Notre Dame hydroelectric project on the St. Joseph River in downtown South Bend. (Photo by Matt Cashore/University of Notre Dame)
Copyright University of Notre Dame
Copy link below when linking to original image:
https://photos.nd.edu/image/I0000OaSZMLWauDk