December 20, 2021; Turbines installed at the Notre Dame hydroelectric project on the St. Joseph River in downtown South Bend. (Photo by Matt Cashore/University of Notre Dame)

MC 12.20.21 Hydroelectric Project Turbines 05.JPG

Purchase Print

1 of 1

December 20, 2021; Turbines installed at the Notre Dame hydroelectric project on the St. Joseph River in downtown South Bend. (Photo by Matt Cashore/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I0000OaSZMLWauDk

Keywords:

hydroelectric
energy
green
sustainability
2021
dam
river
st.
joseph
hydro
project