March 9, 2016; Level 5.5 of VIP suite in the Duncan Student Center. (Photo by Barbara Johnston/University of Notre Dame)

3.9.16 Campus Crossroads 2388.JPG

Purchase Print

1 of 1

March 9, 2016; Level 5.5 of VIP suite in the Duncan Student Center. (Photo by Barbara Johnston/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I0000tYEovO9r0a4

Keywords:

Level 5.5
VIP suite
Duncan
Crossroads
construction
football
stadium