MC 4.22.21 Hydroelectric Project 06.JPG
- 1 of 1


April 22, 2021; A worker's boots are coated in the clay that makes up the river bed of the St. Joseph River. The worker is part of the hydroelectric project at the St. Joseph River dam in downtown South Bend (Photo by Matt Cashore/University of Notre Dame)
Copyright University of Notre Dame
Copy link below when linking to original image:
https://photos.nd.edu/image/I0000uTBXwlVGuXQ