PR 8.04.17 Library Floor Cutting Progress 7.jpg
- 1 of 1


August 4, 2017; 1st Floor Hesburgh Library, Opening for New Staircase to 2nd Floor. (Photo by Peter Ringenberg/University of Notre Dame)
Copyright University of Notre Dame
Copy link below when linking to original image:
https://photos.nd.edu/image/I0000wa6aWI7iFe4